About the project
T.A.G. Construction carried out demolition works at the Daikin Factory facility in Singapore to support the reconfiguration of the client's manufacturing and operational spaces.
The scope covered designated factory sections and structural elements, machinery foundations, pits and plinths, heavy-duty M&E installations, and overhead crane rails and gantry structures. Work followed a phased sequence: hazardous-materials survey and abatement, isolation of services, soft strip, then structural demolition with high-reach excavators and hydraulic crushers, using diamond cutting and controlled breaking next to vibration-sensitive areas.
Concrete was recycled as road base and fill, steel went to licensed recyclers, and the site was backfilled, compacted and prepared for the client's next phase. The project was completed safely within the agreed programme.
More projects
All projects
Excavation Work at Kranji Crescent
Excavation works at Kranji Crescent, involving earth moving and site preparation using heavy machinery for subsequent construction activities.

Demolition at Casa Sophia Condominium
Demolition of Casa Sophia Condominium, a residential property requiring careful planning and execution for the complete removal of existing condominium structures.

Demolition at 15 Senoko Way
Demolition works at 15 Senoko Way deploying hydraulic excavators with boom arm fitted with crusher, bucket, and breaker heads for systematic structural removal.
Ready to Discuss Your Next Project?
Get a free site assessment and scope consultation.
Singapore 408860
Tel 6295 5800 · Fax 6295 5606
enquiry@tagconstruction.com.sg