
About the project
T.A.G. Construction reinstated an industrial unit at Woodlands Industrial Park D, returning the premises to their original bare condition as required by the landlord before lease expiry.
Working from the original lease plans, our team removed tenant-installed partitions, raised floors, ceilings, production-line infrastructure, mezzanines and M&E services, and hacked out added screeds and finishes while preserving the landlord's base building.
Waste was segregated to NEA classifications for recycling or licensed disposal, followed by making-good: patching, reinstated floor screeds and finishes, restored ceilings, repainting and final cleaning. The unit passed the joint inspection on the first attempt.
More projects
All projects
Daikin Factory
Industrial demolition project at the Daikin Factory, involving the dismantling of factory structures and clearance of the industrial site.

Excavation Work at Kranji Crescent
Excavation works at Kranji Crescent, involving earth moving and site preparation using heavy machinery for subsequent construction activities.

Demolition at Casa Sophia Condominium
Demolition of Casa Sophia Condominium, a residential property requiring careful planning and execution for the complete removal of existing condominium structures.
Ready to Discuss Your Next Project?
Get a free site assessment and scope consultation.
Singapore 408860
Tel 6295 5800 · Fax 6295 5606
enquiry@tagconstruction.com.sg