Demolition at 31 Tanjong Penjuru
T.A.G. Construction successfully executed a large-scale demolition project at 31 Tanjong Penjuru, located in Singapore’s established Jurong industrial district. This project required the complete teardown of existing commercial and industrial structures, followed by thorough site clearance and debris removal to prepare the plot for its next phase of use - all while maintaining full compliance with BCA and NEA regulations.
About the project
Working within a busy industrial zone, our team implemented strict safety protocols and dust suppression measures to minimise impact on surrounding operations. Heavy-duty excavators and hydraulic breakers were deployed for controlled structural demolition, while waste materials were sorted on-site for proper recycling and disposal. The project was delivered safely, on time, and within budget - reinforcing our reputation as a trusted demolition contractor in Singapore’s western industrial corridor.
Industrial demolition done right - T.A.G. Construction combines heavy-duty capability with meticulous safety planning for every project.
Demolition methods used
Crushing
Crushing approach is used by applying strength to fragment the concrete into smaller pieces so as to demolish the concrete structure. Such approach is usually employed for the demolition of sub-structures of a building. Hydraulic excavator is commonly fitted with crusher header for such activity,
Breaking
Breaking approach is used by breaking up the concrete structures into smaller pieces, Such approach is usually employed for the demolition of sub-structures of a building. Hydraulic excavator is commonly fitted with breaker head for such activity.
Bucketing
Bucketing approach is used for scooping up loose concrete elements after crushing and breaking. The loose concrete elements will be bucketed up to a tipper truck for disposal. Hydraulic excavator is commonly fitted with bucket head for such activity.
Project photos




More projects
All projectsDemolition at 14 Senoko Loop
Demolition of a single storey factory adjoining two storey administration building at 14 Senoko Loop, north Singapore, with a gross floor area of about 8,394 square metres.
Demolition at 256 Holland Road
Demolition of a two storey detached house on Holland Road, central Singapore, with a gross floor area of about 1,238 square metres on a 999-year leasehold land plot.

Demolition at Gong Shang Primary School
Check out the current demolition project that we are working on for our clients...
Ready to Discuss Your Next Project?
Get a free site assessment and scope consultation.
Singapore 408860
Tel 6295 5800 · Fax 6295 5606
enquiry@tagconstruction.com.sg