
About the project
T.A.G. Construction demolished multi-storey classroom blocks at Gong Shang Primary School to make way for the school's redevelopment.
The three- and four-storey reinforced-concrete blocks were brought down with long-reach excavators fitted with hydraulic crushers, working bay by bay from the top down so that the structure remained stable at every stage. With HDB blocks and occupied buildings nearby, dust suppression, noise control and a strict working-hours programme were maintained throughout.
Concrete and steel were separated on site for recycling, and the cleared site was handed over for the new construction.
More projects
All projects
Demolition and Reinstatement of F1 Storage Hub
Full-scale demolition and reinstatement works at the F1 Storage Hub, involving structural dismantling and site restoration to original condition.

Reinstatement at Woodlands Industrial Park D
Reinstatement works at Woodlands Industrial Park D, restoring the industrial site to its original condition following demolition and clearance operations.

Daikin Factory
Industrial demolition project at the Daikin Factory, involving the dismantling of factory structures and clearance of the industrial site.
Ready to Discuss Your Next Project?
Get a free site assessment and scope consultation.
Singapore 408860
Tel 6295 5800 · Fax 6295 5606
enquiry@tagconstruction.com.sg