Demolition at 126 Branksome Road

A two (2) storey detached house on Branksome Road, located on the East part of Singapore. It sits on a Freehold land plot and has a gross floor area of about 1,404 square metres.

Demolition at 126 Branksome Road

Our approaches of demolition involve the deployment of hydraulic excavator with boom arm fitted with either a crusher head, bucket head or breaker head depending on the work activity.

"Besides profitability, we strive to provide a pinnacle service standard to all industry players."

Crushing approach is used by applying strength to fragment the concrete into smaller pieces so as to demolish the concrete structure. Such approach is usually employed for the demolition of sub-structures of a building. Hydraulic excavator is commonly fitted with crusher header for such activity,

Breaking approach is used by breaking up the concrete structures into smaller pieces, Such approach is usually employed for the demolition of sub-structures of a building. Hydraulic excavator is commonly fitted with breaker head for such activity.

Bucketing approach is used for scooping up loose concrete elements after crushing and breaking. The loose concrete elements will be bucketed up to a tipper truck for disposal. Hydraulic excavator is commonly fitted with bucket head for such activity.